Connect with us on

LinkedIn YouTube Facebook Twitter Instagram WeChat

GPR 250 Index Series: Preliminary Constituents 10 September 2020

The following preliminary constituent changes to the GPR 250 Index and GPR 250 REIT Index (indicated with an asterisk) will become effective as per 21 September 2020 (start of trading).

Download the Report